{"id":3155,"date":"2025-10-29T14:33:38","date_gmt":"2025-10-29T05:33:38","guid":{"rendered":"https:\/\/xb317241.xbiz.jp\/?page_id=3155"},"modified":"2026-01-09T10:50:09","modified_gmt":"2026-01-09T01:50:09","slug":"ict","status":"publish","type":"page","link":"https:\/\/www.takeuchi-const.co.jp\/en\/synergy\/ict\/","title":{"rendered":"About the Use of ICT"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Overview of ICT<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">ICT (Information and Communication Technology) refers to the effective use of technologies related to information and communication.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Today, the introduction of ICT has become an essential factor for improving efficiency and accuracy at construction sites.<br>\nControl data for construction machinery using GNSS (Global Navigation Satellite Systems) and topographic survey data obtained from aerial drone surveys are centrally managed through ICT and utilized across each production process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The transfer and sharing of information through such integrated systems enable greater efficiency and improved quality throughout the construction process.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full ptn_fig\">\n  <img loading=\"lazy\" decoding=\"async\" width=\"567\" height=\"415\" src=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_a01.png\" alt=\"Overview of ICT\" class=\"wp-image-3375\" srcset=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_a01.png 567w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_a01-300x220.png 300w\" sizes=\"auto, (max-width: 567px) 100vw, 567px\" \/>\n<\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Use of ICT at Takeuchi Construction<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Development of New Technologies and Quality Control<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">At Takeuchi Construction, we actively introduce ICT to support the development of new technologies such as \u201cTNF 2.0\u201d and \u201cDD Foundation,\u201d as well as to enhance quality control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Through data analysis and advanced simulations using ICT, we are able to obtain highly accurate information and achieve improved quality. In addition, data recording and tracking have become easier, enabling faster identification and resolution of quality-related issues.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Improved Construction Efficiency and Workforce Reduction<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The use of ICT has dramatically advanced the efficiency and automation of construction processes and tasks, significantly reducing manual workloads.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As a result, the time and labor previously required for manual work have been reduced, allowing workers to focus on more specialized tasks and new challenges such as improving overall project quality.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ICT Operational Workflow<\/h2>\n\n\n\n<div class=\"wp-block-group ptn_row is-nowrap is-layout-flex wp-container-core-group-is-layout-8f761849 wp-block-group-is-layout-flex\">\n  \n  <div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n    \n    <h3 class=\"wp-block-heading\">1. Design<\/h3>\n    \n\n    \n    <p class=\"wp-block-paragraph\">Output 3D data after completing the design using <a href=\"https:\/\/www.takeuchi-const.co.jp\/en\/synergy\/bim\/\" data-type=\"page\" data-id=\"3151\">BIM (Building Information Modeling)<\/a>.<\/p>\n    \n  <\/div><\/div>\n  \n\n  \n  <figure class=\"wp-block-image size-large\">\n    <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"618\" src=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b01-1024x618.png\" alt=\"Design\" class=\"wp-image-3376\" srcset=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b01-1024x618.png 1024w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b01-300x181.png 300w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b01-768x464.png 768w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b01.png 1315w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/>\n  <\/figure>\n  \n<\/div>\n\n\n\n<div class=\"wp-block-group ptn_row is-nowrap is-layout-flex wp-container-core-group-is-layout-8f761849 wp-block-group-is-layout-flex\">\n  \n  <div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n    \n    <h3 class=\"wp-block-heading\">2. ICT Data Preparation<\/h3>\n    \n\n    \n    <p class=\"wp-block-paragraph\">Using the 3D design data, data for ICT-enabled machinery is created.<\/p>\n    \n  <\/div><\/div>\n  \n\n  \n  <figure class=\"wp-block-image size-large\">\n    <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"731\" src=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b02-1024x731.png\" alt=\"ICT Data Preparation\" class=\"wp-image-3377\" srcset=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b02-1024x731.png 1024w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b02-300x214.png 300w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b02-768x548.png 768w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b02.png 1502w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/>\n  <\/figure>\n  \n<\/div>\n\n\n\n<div class=\"wp-block-group ptn_row is-nowrap is-layout-flex wp-container-core-group-is-layout-8f761849 wp-block-group-is-layout-flex\">\n  \n  <div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n    \n    <h3 class=\"wp-block-heading\">3. Construction<\/h3>\n    \n\n    \n    <p class=\"wp-block-paragraph\">Construction is carried out using ICT-enabled machinery, and quality control is performed.<\/p>\n    \n  <\/div><\/div>\n  \n\n  \n  <figure class=\"wp-block-image size-full\">\n    <img loading=\"lazy\" decoding=\"async\" width=\"1150\" height=\"701\" src=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b03.jpg\" alt=\"Construction\" class=\"wp-image-3378\" srcset=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b03.jpg 1150w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b03-300x183.jpg 300w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b03-1024x624.jpg 1024w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b03-768x468.jpg 768w\" sizes=\"auto, (max-width: 1150px) 100vw, 1150px\" \/>\n  <\/figure>\n  \n<\/div>\n\n\n\n<div class=\"wp-block-group ptn_row is-nowrap is-layout-flex wp-container-core-group-is-layout-8f761849 wp-block-group-is-layout-flex\">\n  \n  <div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n    \n    <h3 class=\"wp-block-heading\">4. Report Generation<\/h3>\n    \n\n    \n    <p class=\"wp-block-paragraph\">Since construction data is managed in the cloud, reports can be generated promptly.<\/p>\n    \n  <\/div><\/div>\n  \n\n  \n  <figure class=\"wp-block-image size-large\">\n    <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"636\" src=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b04-1024x636.png\" alt=\"Report Generation\" class=\"wp-image-3379\" srcset=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b04-1024x636.png 1024w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b04-300x186.png 300w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b04-768x477.png 768w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b04-1536x954.png 1536w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b04.png 1855w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/>\n  <\/figure>\n  \n<\/div>\n\n\n\n<div class=\"wp-block-group ptn_row is-nowrap is-layout-flex wp-container-core-group-is-layout-8f761849 wp-block-group-is-layout-flex\">\n  \n  <div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n    \n    <h3 class=\"wp-block-heading\">5. Inspection<\/h3>\n    \n\n    \n    <p class=\"wp-block-paragraph\">The stored data can be utilized during inspections.<\/p>\n    \n  <\/div><\/div>\n  \n\n  \n  <figure class=\"wp-block-image size-full\">\n    <img loading=\"lazy\" decoding=\"async\" width=\"795\" height=\"500\" src=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b05.jpg\" alt=\"Inspection\" class=\"wp-image-3381\" srcset=\"https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b05.jpg 795w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b05-300x189.jpg 300w, https:\/\/www.takeuchi-const.co.jp\/en\/wp-content\/uploads\/2025\/10\/ict_b05-768x483.jpg 768w\" sizes=\"auto, (max-width: 795px) 100vw, 795px\" \/>\n  <\/figure>\n  \n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Overview of ICT ICT (Information and Communication Technology) refers to the effective use of technologies related to information and communication. Today, the introduction of ICT has become an essential factor for improving efficiency and accuracy at construction sites. Control data for construction machinery using GNSS (Global Navigation Satellite Systems) and topographic survey data obtained from [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":27,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-3155","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.takeuchi-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/3155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.takeuchi-const.co.jp\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.takeuchi-const.co.jp\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.takeuchi-const.co.jp\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.takeuchi-const.co.jp\/en\/wp-json\/wp\/v2\/comments?post=3155"}],"version-history":[{"count":2,"href":"https:\/\/www.takeuchi-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/3155\/revisions"}],"predecessor-version":[{"id":4689,"href":"https:\/\/www.takeuchi-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/3155\/revisions\/4689"}],"up":[{"embeddable":true,"href":"https:\/\/www.takeuchi-const.co.jp\/en\/wp-json\/wp\/v2\/pages\/27"}],"wp:attachment":[{"href":"https:\/\/www.takeuchi-const.co.jp\/en\/wp-json\/wp\/v2\/media?parent=3155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}